SunCable AAPowerLink

SunCable AAPowerLink Project 

Harnessing solar energy in Australia’s Northern Territory to power Darwin and Singapore.

SunCable

|

Australia/Singapore

|

2021 - Ongoing

World’s largest integrated renewable energy and battery storage facility.

Enabled the long-distance transmission of up to 1.75 GW of renewable energy from Australia to Singapore.

4,300-km HVDC link utilizing cutting-edge subsea cables.

Challenges

  • SunCable set out to develop the world’s largest and most complex integrated transmission, renewable energy and battery storage facility. 


  • To build the facility, SunCable needed to navigate complex regulatory approvals across Australian, Indonesian, and Singaporean jurisdictions. 


  • This undertaking would ensure the sustainability and financial viability of long-distance power transmission from Australia to Singapore. 


  • SunCable needed a partner to help implement state-of-the-art HVDC technology over vast distances and assist in overcoming technical hurdles. 

Solutions

  • Implemented cutting-edge HVDC technology for long-distance power transmission.  


  • Assisted in the design and delivery strategy for the end-to-end high-voltage transmission system. 


  • Leveraged our extensive regulatory expertise to advise on regulatory approvals within three major jurisdictions. 


  • Utilized +/-525 kV HVDC Voltage Sourced Converter system for efficient power transmission. 


  • Supported the project with our global Environment and Sustainability team's expertise. 

Highlights

  • 6 GW of renewable energy and up to 6 GW of transmission to match the ultimate generation and optimize the line's carrying capacity.

 

  • Provided the most sustainable and financially viable means of transmitting bulk power over long distances. 


  • Minimized transmission system losses and corridor requirements by implementing state-of-the-art HVDC technology using grid forming techniques.


  • Enabled the transmission of up to 1.75 GW of renewable energy from Australia to Singapore.

 

  • High voltage cable facility: 

First facility of its kind in the southern hemisphere 

One of the largest currently being considered for development globally. 

Features a 185m tall concrete tower for a vertical manufacturing process.


  • Completed a scoping study and FEL2.

Project Numbers

6 GW of renewable energy  
Up to 6 GW of transmission  
97% utilization of the transmission system 
4,300 km subsea cable to Singapore 
800 km overhead HVDC transmission line 
3 jurisdictions covered 
185-m-tall concrete tower for vertical manufacturing process at the cable factory